Commissioning is a critical stage in the introduction of new or upgraded equipment. At FETC, we conduct thorough testing of all equipment functionality to ensure reliable and stable operation. Our technicians perform all necessary adjustments and settings to maximize productivity and minimize the risk of breakdowns. We strive to ensure that our equipment operates in full compliance with technical requirements and industry standards.
Stages
1. Inspection of the production site
2. Installation of equipment in a permanent location
3. Checking the functionality of all units and assemblies
4. Setting up the equipment
5. Production of a trial batch of products
6. Briefing and practical training of personnel
7. Transfer of equipment to the production cycle
Advantages
01
The entire range of works on installation, testing and commissioning of equipment is carried out entirely by our company.
02
During commissioning, we independently assemble, install, connect, check, start and test on blanks all equipment subject to commissioning.
03
We provide all necessary specialists - from engineers to workers